Return to Wildland Fire
Return to Northern Bobwhite site
Return to Working Lands for Wildlife site
Return to Working Lands for Wildlife site
Return to SE Firemap
Return to the Landscape Partnership Literature Gateway Website
return
return to main site

Skip to content. | Skip to navigation

Sections

Personal tools

You are here: Home / Projects / Projects RSS

Projects RSS

Presentation: Fish Occupancy & Stream Temperature
Fish Occupancy & Stream Temperature: Models & metrics for planning and management. NALCC Connecticut River Watershed Pilot Project, Aquatics Subgroup, June 27, 2014.
Document: Notes from July 22, 2014
Aquatics meeting notes/summary
Presentation: Aquatics - Landscape Conservation Design
Designing Sustainable Landscapes in the Northeast: A project of the NALCC and the Northeast Climate Science Center. Landscape Conservation Design, July 2014. Presentation for afternoon Aquatics Subteam breakout session.
Copper Creek In-Stream Habitat Restoration Project
This project improved riparian zones, water quality, appropriate sediment flows and restoring physical habitat for multiple listed aquatic species in the Copper Creek watershed, within the Upper Tennessee River Basin. (Photo: The low water bridge that was removed and replaced with a new bridge that spans the river. )
Cerulean Warbler Forest Management Project
The Cerulean Warbler project was initiated to allow the scientific and management communities to test forestry methods and use experimental harvesting of timber to enhance Cerulean Warbler habitat.
Promotion of Prescribed Fire
The use of prescribed fire as a habitat management tool is vital for many of the priority birds in the Central Hardwoods Bird Conservation Region. Most species evolved to live in fire-mediated habitats that were common prior to European settlement. Fire suppression in these habitats is considered a significant factor in the declines of many grassland-shrubland bird populations. Promotion and protection of this management practice is important to achieving the CHJV’s population goals for these species.
Kentucky-Bayou de Chien/Jackson Creek Tributary Restoration Project
In-stream restoration
Greene County Park Stream Restoration and Interpretative Trail NFHAP / SARP Project
in-stream restoration, trail creation
Harpeth River Restoration
As part of a jointly funded project via the National Fish Passage Program, the totality of this project is removing a lowhead dam and restoring the immediate area to riffle/run habitat for the benefit of improved water quality and native fish habitat in the Harpeth River, TN. (Photo: Harpeth River Restoration)
Nashville crayfish Habitat Restoration on the Nashville Zoo Property
This project will restore an unnamed tributary of Mill Creek by removing a barrier and restoring connectivity of the tributary.
Valley River Watershed Habitat Restoration Project
Valley River is an outstanding aquatic resource in the mountain region of North Carolina; however,303(d) listing and habitat degradation haw become more consistently the norm across the watershed. To address these problems, HRWC established,enhanced and estored adequate riparian buffers along the banks of the stream, restored aquatic habitat by reducing sedimentation and adding large woody debris in appropriate areas, and educated watershed residents about the river and these needs. (Photo: Murphy Track Site During)
Green River Enhancement within the Green River WMA, KY
The Green River and Green River Lake and provide aquatic habitat in the Green River Wildlife Management Area. The river is in declining condition due to severe erosion over almost four decades. Its restoration can allow it to support thriving populations of white bass, smallmouth bass, rock bass, flathead catfish, walleye, and muskellunge, and provide sport challenges to anglers. (Photo: Green River Pre Restoration)
Brook Trout Catchment Scale and Climate Change Vulnerability Assessment
JMU in partnership with the U.S. Forest Service and the Service have initiated efforts to determine resiliency rankings for brook trout populations in Virginia, Maryland and West Virginia. This project will allow the partnerhsip to expand this analysis to cover all brook trout habitat from Georgia to Maine.
Restoring Browns Run Fish Passage, Barr Township, Pennsylvania
This project will open the headwaters of Browns Run, a tributary to the West Branch of the Susquehana River, to native brook trout passage and improve Browns Run brook trout habitat. (Photo: Pool Behind Browns Run Dam, Pennsylvania.)
Restoring Aquatic Organism Passage within Tipton Creek, North Carolina
This project will be the first of several designed to reconnect and restore brook trout habitat and populations within the Tellico River watershed. It will remove one barrier on Tipton Creek in the Upper Tellico River Watershed to reconnect approximately 4 miles of stream. (Photo: The crossing to be replaced on Tipton Creek in North Carolina.)
Thorn Creek Aquatic Passage Project, Pendelton County, West Virginia
This project will remove the 9 identified fish passage barriers in a 50 square mile wild brook trout watershed in Thorn Creek of the South Branch of the Potomac. (Photo: Typical low water bridge crossing to be removed on Thorn Creek in West Virginia.)
Brook Trout Restoration and Expansion in Garth Run, Virginia
This project will restore and improve stream and riparian habitat within a 2,357 foot project area located in the headwaters of Garth Run which was severely impacted by catastrophic flooding that occurred in 1995. (Photo: Photo 1 of Garth Run, Virginia)
Upper Shavers Fork Aquatic Passage Project, West Virginia
This project seeks to restore habitat linkages between two spawning tributaries and the mainstem of Upper Shaver's Fork between Cheat Bridge and Spruce, West Virginia. (Photo: The Beaver Creek Culverts to be replaced.)
Brook Trout Restoration in the Chattahoochee National Forest, Georgia
This project will restore fragmented poor quality habitat and brook trout populations on the Chattahoochee National Forest in Georgia by removing and replacing a culvert on Bryant Creek that is perched and acts as a barrier to fish movement. (Photo: The culvert to be replaced on Bryant Creek in the Chattachoochee National Forest.)
Oats Run, Upper Shavers Fork, Aquatic Passage Project in Pocahontas County, WV
This project will restore habitat linkages between a brook trout spawning tributary in Oats Run and the mainstem of the Upper Shaver's Fork at Spruce West Virginia. (Photo: The fish passage barrier to be replaced on Oats Run in the Upper Shavers Fork in West Virginia.)