Landscape Partnership Resources Library
Goal 1 - Data and Toolsets
Work Plan - Section B, Goal 1: Create and deliver a landscape-level data sharing strategy and scalable toolsets
2011 Workshop Report - Conservation Priorities Science Needs
As prepared under the DJ Chase contract by Dr. Gwen White (182 pgs). This is the FULL Report that includes details on how the Workshop was organized, the final Science Needs Portolio (draft - compliation) generated by the various Thematic Work Groups, and the Workshop evaluations and recommendations.
Top Ranked Science Needs - Nov 2011
Product of Day-3 (meeting as the Integrated Planning - Synthesis Team) to generate Top Ranked Science Needs following 2-days of Nov 2011 Science Needs Workshop.
DOI - OIG - Start-up Evaluation (ex.)
This was an example of the DOI OIG Audit of a new program within DOI (as an example of approach but is not an audit of the LCCs.)
DOI - Work Force Planning
Dept of Interior - Office of Inspector General - Work Force Planning Guide.
First Analysis (Udall Institute) Report
This was the very first attempt to examine the early LCC structures. This document was reviewed in the Analysis prepared by staff (but some of the characterization used in the document was revised/reorganized in staff's later analysis.
Illustrative Diagram of the Governance Structure
This analysis was based on the 2011 (16 established) LCCs.
Quick Reference Guide - on the ISC Governance/Charter
This is a 'snap shot' of key requirements from the Interim Governance/Charter as approved by the Interim Steering Committee in 2011. It was prepared primarily to answer Administrative issues that may arise during Steering Committee meetings and calls.